Zone C · El Dorado Irrigation District
Irrigation repair
in El Dorado Hills.
Most of what you will find online about watering days in El Dorado Hills is a decade out of date. EID rescinded its assigned-day schedule in 2016 and returned to normal supply conditions in April 2023. There is no day-of-week rule to break. What EID does have is stranger and more useful: a regulation that is in force every day of every year, and under which a broken sprinkler is not evidence of a violation — it is the violation.
The rules that apply to your address
El Dorado Hills water rules.
Administrative Regulation 1041 is, in EID’s own words, “in effect all year under all conditions.” Among the prohibited acts: operating an irrigation system that applies water to an impervious surface, or that is in disrepair. Not wasting water through a broken system — operating one. Also prohibited: irrigating during or within 48 hours of measurable precipitation, and any hose without a shut-off nozzle.
AR 1041.5 sets the ladder. First violation, a written cease-and-desist. Second, $100 or 20% of your two-month water bill, whichever is greater. Third, $200 — and three inside twelve months allows EID to discontinue service, with a $100 reconnection fee. Fourth, $500. None of this requires a drought to be declared.
The Board rescinded the Stage 1 Water Alert on 24 April 2023 and returned to normal water supply conditions. The odd/even schedules still circulating in search results date from 2014–15 and were rescinded in 2016. If you are following one, you are following a rule that has not existed for ten years.
EID states plainly that maintenance of the pressure regulator is the homeowner’s responsibility, that regulators last about 10–15 years, and that failure shows up as a sudden or fluctuating pressure change. EID operates 200 pressure regulation zones across a service area that climbs from 500 feet at the county line to well over 4,000. Two houses a mile apart are not on the same pressure. This is the single most under-diagnosed fault up here.
Up to $250 per service account in 2026, first come while funding lasts. The Tier 1 list (up to $100) includes irrigation efficiency upgrades and weather-based irrigation controls; Tier 2 (up to $250) covers an electronic flow monitoring device on the potable service line. We read the 2026 form itself: it carries no licensed-contractor, professional-installation, permit or inspection requirement, so work we do is eligible. Keep the dated receipt and submit within 60 days. EID publishes no leak-repair rebate — anyone implying otherwise is guessing.
The district offers a complimentary landscape survey including help with leak detection, at 530-642-4000, and gives away dye packets and flappers at its Placerville office. If a free assessment is what you need, take it. What it does not do is fix anything, or take responsibility for the diagnosis being right. That is the part we sell.
Elsewhere on the map